Lindner Tower and Grow Library Boiler Installation

2018-09-04T18:39:32+00:00

Lindner Tower and Grow Library Boiler Installation Lombard, IL Clark Dietz performed a study evaluating various heating options for the existing Lindner Tower, a seven story student housing building, and the campus wide hot water heating system, which also provides heat to the old Administrative Building and the Grow Library. The existing heating system [...]

Manufacturing Plant Retrofit – Phase 1 and 2

2018-09-04T18:56:51+00:00

Manufacturing Plant Retrofit - Phase 1 and 2 Bridgeview, IL Clark Dietz provided mechanical, electrical, and structural design and construction phase engineering services to convert a building from a heavy to light manufacturing. The project included updating plant heating and ventilation, electrical, plumbing and fire protection systems. Power, natural gas, and compressed air were [...]

City Hall HVAC Control System Final Design

2018-09-04T17:26:44+00:00

City Hall HVAC Control System Final Design Rolling Meadows, IL The existing HVAC system for this building was originally installed in 1987. Virtually from the beginning, the HVAC system underperformed the expectations of the building occupants. City staff experienced a wide range of HVAC problems including overheating, over cooling, excess humidity, and draftiness. Clark [...]

Upgrade for Life Safety – ISU

2018-09-04T17:03:15+00:00

Upgrade for Life Safety - Illinois State University, Turner and Stevenson Halls Normal, IL This rehabilitation project corrected life safety deficiencies, with a primary focus on complete replacement of deficient fire alarm and detection systems, installation of new sprinkler systems, correction of accessibility deficiencies, and asbestos. The project was initiated with a complete analysis [...]

Weston 4 Power Plant

2017-08-10T19:45:32+00:00

Weston 4 Power Plant Weston, WI As a sub-tiered engineer/consultant to one of the project's general contractors, Clark Dietz provided the HVAC and secondary electrical systems design for the remodel of the facility's existing office and the new control and operations building (dark building shown in foreground of picture). The five-story building houses the [...]