Skip to content
Clark Dietz, Inc. Logo Clark Dietz, Inc. Logo Clark Dietz, Inc. Logo
  • ABOUT
    • About Us
    • Blog
    • Company News
    • Giving Back
  • SERVICES
    • Renewable Energy
    • Construction
    • Electrical »
      • Arc Flash Analysis
      • Electrical
    • Environmental + Cultural
    • Mechanical
    • Municipal Engineering
    • Public Involvement
    • Site/Civil
    • Transportation »
      • Highways + Interstate
      • Local + County Roads
      • Structural + Bridges
      • Transportation
      • Urban Revitalization
    • Water »
      • Drinking Water
      • Stormwater
      • Wastewater
  • WORK
  • PEOPLE
  • CAREERS
  • CONTACT
  • BIDDING DOCUMENTS
  • ABOUT
    • About Us
    • Blog
    • Company News
    • Giving Back
  • SERVICES
    • Renewable Energy
    • Construction
    • Electrical »
      • Arc Flash Analysis
      • Electrical
    • Environmental + Cultural
    • Mechanical
    • Municipal Engineering
    • Public Involvement
    • Site/Civil
    • Transportation »
      • Highways + Interstate
      • Local + County Roads
      • Structural + Bridges
      • Transportation
      • Urban Revitalization
    • Water »
      • Drinking Water
      • Stormwater
      • Wastewater
  • WORK
  • PEOPLE
  • CAREERS
  • CONTACT
  • BIDDING DOCUMENTS

Chevron WORK
Our Workclarkdietz2021-04-23T16:19:43+00:00
  • All
  • Award Winner
  • Construction Engineering
  • Drinking Water
  • Electrical
  • Highways + Interstates
  • Local + County Roads
  • Mechanical
  • Municipal Engineering
  • Public Involvement
  • Service
  • Site/Civil
  • Stormwater
  • Structural + Bridges
  • Transportation
  • Urban Revitalization
  • Wastewater
Kenosha Parking StructureScott Anstandig2022-12-12T17:38:41+00:00
Kenosha Parking Structure

Kenosha Parking Structure

Transportation, Urban Revitalization
Stewart Avenue Lift Station and Sewer System Planningclarkdietz2022-03-21T20:57:45+00:00
Construction: Stewart Avenue Lift Station and Sewer System Planning

Stewart Avenue Lift Station and Sewer System Planning

Award Winner, Construction Engineering, Site/Civil, Wastewater
West Washington Street Watershed Drainage Improvements & Community Green Spaceclarkdietz2022-03-21T20:59:52+00:00
West Washington Retention Basin: Facing East

West Washington Street Watershed Drainage Improvements & Community Green Space

Award Winner, Stormwater, Urban Revitalization
West Washington Street Drainage Improvements, Phase Iclarkdietz2022-03-21T21:00:41+00:00
West Washington Street Drainage Improvements

West Washington Street Drainage Improvements, Phase I

Award Winner, Stormwater, Urban Revitalization
Wausau Main Fire Stationclarkdietz2022-03-21T21:02:19+00:00
Wausau Main Fire Station Exterior

Wausau Main Fire Station

Electrical, Mechanical
Power Generation Plant Fire Protectionclarkdietz2022-03-21T21:03:17+00:00
Power Generation Plant

Power Generation Plant Fire Protection

Electrical, Mechanical
College of Medicine Boiler and Chiller Replacementsclarkdietz2022-03-21T21:04:34+00:00
Rockford College of Medicine: Exterior

College of Medicine Boiler and Chiller Replacements

Electrical, Mechanical
Fire Stations 15 and 16: MEP and Civil Servicesclarkdietz2021-03-02T18:44:56+00:00
Fire Stations 15 and 16: Truck Bay

Fire Stations 15 and 16: MEP and Civil Services

Electrical, Mechanical
Public Safety/Police Facility and Municipal Courtclarkdietz2021-03-02T18:30:06+00:00
Public Safety/Police Facility Exterior

Public Safety/Police Facility and Municipal Court

Electrical, Mechanical
UIUC Huff Hall and Armory Life Safety Correctionsclarkdietz2021-03-01T16:34:27+00:00
UIUC Huff Hall Gym

UIUC Huff Hall and Armory Life Safety Corrections

Electrical, Mechanical
Uptown Circular Intersectionclarkdietz2022-09-13T21:08:54+00:00
Uptown Circular Intersection

Uptown Circular Intersection

Transportation, Urban Revitalization
Basins 7 and 16 Sanitary Sewer Improvementsclarkdietz2022-03-22T14:33:18+00:00
Basin Site

Basins 7 and 16 Sanitary Sewer Improvements

Award Winner, Wastewater
Longmeadow Parkway Improvementsclarkdietz2022-03-22T14:34:18+00:00
Longmeadow Project Aerial

Longmeadow Parkway Improvements

Award Winner, Municipal Engineering, Transportation
Lakefront Lighting Replacementclarkdietz2022-03-22T14:35:18+00:00
Kenosha Lighting Project Image

Lakefront Lighting Replacement

Electrical, Municipal Engineering
Tertiary Filtration Upgrade to Disk Filtersclarkdietz2022-03-22T14:35:59+00:00
Newly Installed Disk Filters

Tertiary Filtration Upgrade to Disk Filters

Wastewater
Westside Connector Roadway & Trailclarkdietz2022-03-22T14:37:11+00:00
Westside Connector Road Complete

Westside Connector Roadway & Trail

Transportation
Western Terrace Neighborhood Water Line Replacementclarkdietz2022-03-18T17:53:53+00:00
Western Terrace Subdivision Sign

Western Terrace Neighborhood Water Line Replacement

Drinking Water
Patrol Road Water Main Replacementclarkdietz2022-03-18T17:53:03+00:00
Patrol Road Water Main Replacement - Water Main Construction

Patrol Road Water Main Replacement

Drinking Water
Deaconess Clinic and Commercial Subdivisionclarkdietz2022-03-22T14:38:19+00:00
Deaconess Clinic and Commercial Subdivision - Aerial of Site

Deaconess Clinic and Commercial Subdivision

Site/Civil, Stormwater
US 27 Pavement Replacementclarkdietz2022-03-22T14:39:36+00:00
Completed US 27 Pavement Replacement

US 27 Pavement Replacement

Transportation
Wausau Schools – Hewitt Texas, Maine, Rib Mountain Generatorsclarkdietz2022-03-22T15:27:26+00:00
Wausau School District Safety Generators

Wausau Schools – Hewitt Texas, Maine, Rib Mountain Generators

Electrical
Wausau School District Referendum Projectsclarkdietz2022-03-22T15:28:36+00:00
GD Jones School

Wausau School District Referendum Projects

Electrical
Grit System Improvementsclarkdietz2022-03-22T15:30:00+00:00
Grit System Improvements Construction

Grit System Improvements

Electrical, Mechanical, Structural + Bridges, Wastewater
Phosphorus Removal Studyclarkdietz2022-03-22T15:30:35+00:00
Phosphorus Removal Study

Phosphorus Removal Study

Wastewater
Inovateus, DeMille Road Solar Facilityclarkdietz2022-03-22T15:31:12+00:00
Solar Panels

Inovateus, DeMille Road Solar Facility

Electrical, Site/Civil
Parking Structure Lighting: Hubbard Woodsclarkdietz2022-03-22T15:39:56+00:00
Parking Structure Lighting: Wall Mount LED

Parking Structure Lighting: Hubbard Woods

Electrical
Gregory Hall HVAC Replacementclarkdietz2022-03-22T15:40:32+00:00
UIUC Gregory Hall

Gregory Hall HVAC Replacement

Electrical, Mechanical
Water Treatment Plant Upgradesclarkdietz2022-03-18T17:55:19+00:00
Water Treatment Plant

Water Treatment Plant Upgrades

Drinking Water
Fabyan Parkway at IL 38 Intersection Improvementclarkdietz2020-10-19T20:36:58+00:00
Fabyan Parkway and IL 38 Intersection Aerial: Completed Project

Fabyan Parkway at IL 38 Intersection Improvement

Construction Engineering, Transportation
Merrill Municipal Outdoor Poolclarkdietz2021-03-05T15:48:03+00:00
Merrill Municipal Outdoor Pool

Merrill Municipal Outdoor Pool

Electrical, Mechanical, Site/Civil
Rails to Trails: B&O Railroad Bridge over Wabash Riverclarkdietz2022-03-22T15:42:41+00:00
B&O Railroad Bridge over the Wabash River - "Rails to Trails"

Rails to Trails: B&O Railroad Bridge over Wabash River

Award Winner, Structural + Bridges, Transportation
North Beach Access Improvements along WWTPclarkdietz2022-03-22T15:43:42+00:00
North Beach Access Improvements

North Beach Access Improvements along WWTP

Award Winner, Site/Civil
Belmont North Relief Interceptorclarkdietz2022-03-22T15:45:02+00:00
Belmont North Relief Interceptor

Belmont North Relief Interceptor

Wastewater
ISU Student Fitness & Kinesiology/Rec. Buildingclarkdietz2020-11-13T21:18:49+00:00
ISU Student Fitness & Kinesiology/Rec. Building

ISU Student Fitness & Kinesiology/Rec. Building

Award Winner, Electrical, Mechanical
Uline Construction Inspectionclarkdietz2022-03-22T15:46:07+00:00
Uline Construction Inspection

Uline Construction Inspection

Construction Engineering
HVAC Equipment and Controls Replacementclarkdietz2022-03-22T15:46:35+00:00
Champaign City Building: HVAC Equipment and Controls Replacement

HVAC Equipment and Controls Replacement

Award Winner, Mechanical
Illinois River Bridgeclarkdietz2022-03-22T15:47:12+00:00
Illinois River Bridge Aerial

Illinois River Bridge

Structural + Bridges, Transportation
Water Treatment Plant Standby Power Upgradeclarkdietz2022-03-22T15:47:43+00:00
Water Treatment Plant Standby Power Upgrade

Water Treatment Plant Standby Power Upgrade

Award Winner, Electrical
UW-Stout Electrical Substation Replacementclarkdietz2020-11-03T20:08:41+00:00
UW-Stout Electrical Substation Replacement

UW-Stout Electrical Substation Replacement

Electrical
John Street Drainage Improvementsclarkdietz2022-03-22T16:14:40+00:00
John Street

John Street Drainage Improvements

Award Winner, Local + County Roads, Stormwater, Transportation, Urban Revitalization
Armed Forces Reserve Center: National Guardclarkdietz2022-03-22T17:41:43+00:00
Armed Forces Reserve Center

Armed Forces Reserve Center: National Guard

Electrical, Mechanical
Franklin County Bridge 110 & 111 Inspectionclarkdietz2022-03-22T17:44:19+00:00
Franklin County Bridge 110 & 111 Inspection

Franklin County Bridge 110 & 111 Inspection

Structural + Bridges, Transportation
Constructed Wetland for Excess Flow Storageclarkdietz2022-03-22T17:45:36+00:00
Constructed Wetland

Constructed Wetland for Excess Flow Storage

Award Winner, Wastewater
Wastewater Treatment Plant Expansion, Phase IIclarkdietz2022-03-22T17:46:00+00:00
Wastewater Treatment Plant Expansion

Wastewater Treatment Plant Expansion, Phase II

Award Winner, Wastewater
East Main Street Improvement Designclarkdietz2022-03-22T17:46:42+00:00
East Main Street Aerial

East Main Street Improvement Design

Award Winner, Transportation, Urban Revitalization
University Avenue Improvementsclarkdietz2022-03-22T17:47:38+00:00
University Avenue Improvements

University Avenue Improvements

Local + County Roads, Transportation
ISTHA Elgin O’ Hare Western Access (IL 390), Irving Park Road to East of Roselle Road (I-13-4602)clarkdietz2022-03-22T17:48:42+00:00
ISTHA Elgin O'Hare Western Access

ISTHA Elgin O’ Hare Western Access (IL 390), Irving Park Road to East of Roselle Road (I-13-4602)

Construction Engineering, Highways + Interstates, Transportation
Low Lift Pumping Station Improvementsclarkdietz2020-11-05T21:33:37+00:00
Low Lift Pumping Station Improvements

Low Lift Pumping Station Improvements

Award Winner, Electrical
Farm Trace Storm Sewer Bypass and Detention Basinclarkdietz2022-03-22T17:49:55+00:00
Detention Basin Completion

Farm Trace Storm Sewer Bypass and Detention Basin

Award Winner, Municipal Engineering, Stormwater
Auburn Road Bridge & Roundaboutclarkdietz2022-03-22T17:52:42+00:00
Auburn Road Bridge

Auburn Road Bridge & Roundabout

Local + County Roads, Structural + Bridges, Transportation
Multimodal Corridor Enhancement (MCORE)clarkdietz2022-06-23T13:32:09+00:00
MCORE Project Lighting

Multimodal Corridor Enhancement (MCORE)

Award Winner, Construction Engineering, Transportation, Urban Revitalization
Construction Management: IL 390 to I-14clarkdietz2022-03-22T17:54:59+00:00
Illinois Tollway Construction Management: Lively Blvd Plaza

Construction Management: IL 390 to I-14

Construction Engineering, Highways + Interstates, Transportation
Maplecrest Road Construction Inspectionclarkdietz2020-10-22T16:04:41+00:00
Maplecrest Road Construction Inspection

Maplecrest Road Construction Inspection

Construction Engineering, Transportation
106th and Towne Roundabout Inspectionclarkdietz2020-10-19T14:42:19+00:00
106th and Towne: Completed Roundabout

106th and Towne Roundabout Inspection

Construction Engineering, Transportation
I-57 at Stuenkel Road Phase IIIclarkdietz2020-11-02T22:12:34+00:00
Stabilized Subbase

I-57 at Stuenkel Road Phase III

Construction Engineering, Transportation
Harrison Street Detention Improvementclarkdietz2022-03-22T17:57:19+00:00
Harrison Street Detention Basin Aerial

Harrison Street Detention Improvement

Award Winner, Construction Engineering, Stormwater
Fairmount Avenue Relief Sanitary Sewerclarkdietz2022-03-22T17:57:55+00:00
Fairmount Avenue after sewer construction

Fairmount Avenue Relief Sanitary Sewer

Stormwater
Pace – Bus Garage Improvements and CNG Fueling Systemclarkdietz2020-10-19T13:53:37+00:00
Mechanical Engineering: Pace Bus Garage

Pace – Bus Garage Improvements and CNG Fueling System

Award Winner, Electrical, Mechanical
Traffic Signal Rehabilitation and Safety Improvementclarkdietz2022-03-22T17:58:59+00:00
Traffic Signal Rehabilitation and Safety Improvements

Traffic Signal Rehabilitation and Safety Improvement

Transportation, Urban Revitalization
Water Main Improvementsclarkdietz2022-03-18T17:56:07+00:00
Water Main Improvements

Water Main Improvements

Drinking Water
Jacksonville Water Treatment Facility Constructionclarkdietz2020-11-13T21:38:25+00:00
Jacksonville Water Treatment Facility: Building Exterior

Jacksonville Water Treatment Facility Construction

Electrical, Mechanical
UIUC Life Safety Improvements, Finish Upgrades and AC Installationclarkdietz2020-11-13T22:37:58+00:00
Life Safety Improvements at UIUC Snyder Hall

UIUC Life Safety Improvements, Finish Upgrades and AC Installation

Electrical, Mechanical
Copper Lake School Security Upgradeclarkdietz2020-11-06T21:31:26+00:00
Copper Lake School Security Upgrade

Copper Lake School Security Upgrade

Electrical
Water Supply Improvements Conceptual Designclarkdietz2022-03-18T17:56:58+00:00
Water Supply Improvements

Water Supply Improvements Conceptual Design

Drinking Water
Water Plant Preliminary Engineeringclarkdietz2022-03-18T17:57:44+00:00
Water Plant Preliminary Engineering - Greenville, IL

Water Plant Preliminary Engineering

Drinking Water
College of Nursing HVAC Systems Upgradeclarkdietz2020-11-05T22:10:32+00:00
Rooftop equipment for the College of Nursing: HVAC Systems Upgrade

College of Nursing HVAC Systems Upgrade

Mechanical
Water Well #20clarkdietz2022-03-18T17:58:22+00:00
Water Well #20: Concrete Pour

Water Well #20

Drinking Water
Main Street Water Main Replacementclarkdietz2022-03-18T17:59:04+00:00
Main Street Water Main Replacement: Piping

Main Street Water Main Replacement

Drinking Water
Lindner Tower and Grow Library Boiler Installationclarkdietz2020-10-19T20:09:56+00:00
Lindner Tower

Lindner Tower and Grow Library Boiler Installation

Electrical, Mechanical
Manufacturing Plant Retrofit – Phase 1 and 2clarkdietz2020-11-06T17:32:37+00:00
Manufacturing Plant Retrofit

Manufacturing Plant Retrofit – Phase 1 and 2

Electrical, Mechanical
City Hall HVAC Control System Final Designclarkdietz2020-03-12T16:22:01+00:00
city hall exterior

City Hall HVAC Control System Final Design

Electrical, Mechanical
Crystal Lake Park Outdoor Aquatic Centerclarkdietz2020-11-04T22:32:28+00:00
Outdoor aquatic center

Crystal Lake Park Outdoor Aquatic Center

Electrical, Mechanical
Life Safety Upgrades at ISUclarkdietz2020-11-13T21:44:26+00:00
ISU life safety upgrade classroom

Life Safety Upgrades at ISU

Electrical, Mechanical
CH 21 Bridges over Lake Fork Creekclarkdietz2022-03-22T18:01:58+00:00
CH 21 Bridge over Lake Fork Creek

CH 21 Bridges over Lake Fork Creek

Structural + Bridges, Transportation
Winnetka Village Hall Standby Generatorclarkdietz2020-11-05T18:44:43+00:00
Winnetka Village Hall: Standby Generator

Winnetka Village Hall Standby Generator

Electrical, Mechanical
College Avenue Bridge over North Branch Sugar Creekclarkdietz2022-03-22T18:02:43+00:00
College Avenue Bridge over Sugar Creek

College Avenue Bridge over North Branch Sugar Creek

Structural + Bridges, Transportation
22nd Street Reconstruction, Butterfield Road to Kingery Highwayclarkdietz2022-03-22T18:03:39+00:00
22nd Street Reconstruction Aerial

22nd Street Reconstruction, Butterfield Road to Kingery Highway

Construction Engineering, Transportation
Vernon Avenue Bridge over Sugar Creekclarkdietz2022-03-22T18:04:17+00:00
Vernon Avenue Bridge over Sugar Creek

Vernon Avenue Bridge over Sugar Creek

Structural + Bridges, Transportation
Weston 4 Power Plant Remodelclarkdietz2020-11-03T22:53:41+00:00
Weston 4 Power Plant

Weston 4 Power Plant Remodel

Electrical
US 51 Environmental Impact Statementclarkdietz2022-03-22T18:05:35+00:00
US 51 Environmental Impact Public Meeting

US 51 Environmental Impact Statement

Highways + Interstates, Public Involvement, Transportation
Jackson Covered Bridge Over Sugar Creekclarkdietz2022-03-22T18:06:15+00:00
Jackson Covered Bridge Over Sugar Creek

Jackson Covered Bridge Over Sugar Creek

Structural + Bridges, Transportation
Wisconsin DNR Northeastern Regional Headquartersclarkdietz2020-11-13T22:14:55+00:00
Wisconsin DNR Regional Headquarters - Electrical Engineering by Clark Dietz

Wisconsin DNR Northeastern Regional Headquarters

Electrical

OFFICE LOCATIONS

ILLINOIS
Champaign  /  Chicago  /  Oakbrook Terrace

INDIANA
Evansville  /  Indianapolis  /  New Albany

KENTUCKY
Lexington  /  Louisville

WISCONSIN
Kenosha  /  Milwaukee  /  Wausau

RSS Clark Dietz Blog

  • Chip Craddock's Lasting Impact On Clark Dietz January 27, 2023
  • Interview with Katy Duffield: Author of Crossings November 28, 2022
  • Employee Spotlight: Meet Ana October 17, 2022

CAREERS

VIEW CAREER OPPORTUNITIES

CONTACT US

WE’D LOVE TO HEAR FROM YOU!

FOLLOW US

© Clark Dietz, Inc. All Rights Reserved.   |   Privacy Policy   |   Terms of Use   |   Sitemap
Page load link
Go to Top