Skip to content
Clark Dietz, Inc. Logo Clark Dietz, Inc. Logo Clark Dietz, Inc. Logo
  • ABOUT
    • About Us
    • Company News
    • Giving Back
  • WORK
  • SERVICES
    • Renewable Energy
    • Construction
    • Electrical »
      • Arc Flash Analysis
      • Electrical
    • Environmental + Cultural
    • Funding Resources
    • Mechanical
    • Municipal Engineering
    • Public Involvement
    • Site/Civil
    • Transportation »
      • Highways + Interstate
      • Local + County Roads
      • Structural + Bridges
      • Transportation
      • Urban Revitalization
    • Water »
      • Drinking Water
      • Stormwater
      • Wastewater
      • Certified Operator Services
  • PEOPLE
  • CAREERS
  • CONTACT
  • BIDDING DOCUMENTS
  • ABOUT
    • About Us
    • Company News
    • Giving Back
  • WORK
  • SERVICES
    • Renewable Energy
    • Construction
    • Electrical »
      • Arc Flash Analysis
      • Electrical
    • Environmental + Cultural
    • Funding Resources
    • Mechanical
    • Municipal Engineering
    • Public Involvement
    • Site/Civil
    • Transportation »
      • Highways + Interstate
      • Local + County Roads
      • Structural + Bridges
      • Transportation
      • Urban Revitalization
    • Water »
      • Drinking Water
      • Stormwater
      • Wastewater
      • Certified Operator Services
  • PEOPLE
  • CAREERS
  • CONTACT
  • BIDDING DOCUMENTS
Employee Interview with Keary Robertsclarkdietz2020-08-14T20:53:35-05:00
Return to the Internships Page

Clark Dietz Interactive Map Andy Ashley Keary Roberts Jose Garcia CJ Beyer Clark Dietz Chicago Team Members REWATCH PROMO VIDEO Kate Kreienkamp

OFFICE LOCATIONS

ILLINOIS
Champaign / Chicago / Oakbrook Terrace

INDIANA
Evansville / Indianapolis / New Albany

KENTUCKY
Lexington / Louisville

MICHIGAN
Lansing / Farmington Hills

WISCONSIN
Kenosha / Milwaukee / Wausau

COMPANY NEWS

  • Pere Marquette project featured image
  • Image of bridge
  • Image of bridge
  • Image of bridge
  • Pere Marquette bridge design sheet
  • Ribbon-cutting of trail
Hannah Soukup2025-10-09T09:24:29-05:00
Reconnecting Clare: Restoring a Historic Bridge to Close the “Clare Gap”
  • River Road Bridge featured image
  • Bridge deck pour
  • Beam installation
  • Bridge deck pour
  • Bridge beam installation
  • Bridge deck pour
Hannah Soukup2025-10-02T08:55:27-05:00
From Cornfields to Concrete: Building the River Road Bridge in Will County
  • St. Joseph featured image
  • After aerial shot of the WWTP
  • Inside of WWTP
Hannah Soukup2025-09-30T09:13:06-05:00
Expanding Growth and Protecting Waterways in St. Joseph

CAREERS

VIEW CAREER OPPORTUNITIES

CONTACT US

Contact us

FOLLOW US

© Clark Dietz, Inc. All Rights Reserved. | Privacy Policy | Terms of Use | Sitemap

Page load link
Go to Top