106th and Towne Roundabout Inspection

Carmel, IN

This signalized intersection was replaced with a two lane roundabout. Due to nearby presence of an elementary school, close collaboration was needed with the City, and the closure was restricted to only 45 days. The project included new storm sewers, underdrains, paths, and ADA curb ramps. Relocation of utilities, including fire hydrants that required temporary shut off of a 20-inch water main, was coordinated by Clark Dietz construction inspection staff during the construction.