Fabyan Parkway at IL 38 Intersection Improvement

2017-11-06T19:25:29+00:00

Fabyan Parkway at IL 38 Intersection Improvement DuPage County, IL Clark Dietz provided construction engineering services for the intersection improvement of IL Route 38 and Fabyan Parkway in West Chicago, IL for the DuPage County Division of Transportation. Fabyan Parkway was reconstructed to provide additional capacity and IL Route 38 was widened and resurfaced [...]

Uptown Circular Intersection

2017-08-11T20:29:15+00:00

Uptown Circular Intersection Normal, IL A principal component of the project involved the replacement of existing streets, with an emphasis on the intersection of Beaufort, North and Constitution Trail in the heart of the uptown district with a circular intersection. The circular intersection replaced a badly skewed stop-controlled intersection and has become the focal [...]

Illinois River Bridge

2017-08-17T16:16:30+00:00

Illinois River Bridge IDOT - Marseilles Roadway PS&E Marseilles, IL Project included roadway/navigation lighting controller, power distribution along bridge and underground on bridge approach, high pressure sodium cobra head luminaires and navigation lights. Design was broken into two phases; Phase I for bridge lighting and Phase II for extending power circuiting from bridge to [...]

John Street Drainage Improvements

2017-08-11T20:35:50+00:00

John Street Drainage Improvements Champaign, IL Challenge Severe flooding and sewer overflows posed an annual threat to the safety of residents along the John Street watershed in Champaign, Illinois. The watershed’s history of flooding dated back to the early 1900s, since then severe flooding was an annual event but the record rainfalls of 2008 [...]

Franklin County Bridge 110 & 111 Inspection

2017-08-10T17:06:27+00:00

Franklin County Bridge 110 & 111 Inspection Indianapolis, IN This project consisted of bridge replacements on Railfence Road over Salt Creek (No. 110) and nearby Harvey Branch (No. 111) including the re-construction of Railfence Road to a 22 foot wide asphalt two lane road, re-alignment of Hilltop Road and Harvey Branch Road in Salt [...]

East Main Street Improvement Design

2017-08-11T20:41:55+00:00

East Main Street Improvement Design New Albany, IN MANSION ROW HISTORIC DISTRICT The Develop New Albany initiative is the driving force behind the many revitalization efforts taking place in downtown New Albany. In response to residents’ desire to preserve the State recognized historical value and character of the Mansion Row Historic District, the City [...]

University Avenue Improvements

2017-08-11T20:39:32+00:00

University Avenue Improvements Champaign, IL This project consisted of design and construction phase services for the traffic signal rehabilitation and pedestrian safety improvements on University Avenue from Randolph Street to Chestnut Street. The project included roadway lighting improvements along University Avenue between State Street and Chestnut Street and an on-street bicycle lane on Walnut [...]

ISTHA Elgin O’ Hare Western Access (IL 390), Irving Park Road to East of Roselle Road (I-13- 4602)

2017-11-08T22:31:18+00:00

ISTHA Elgin O' Hare Western Access (IL 390), Irving Park Road to East of Roselle Road (I-13- 4602) DuPage County, IL This project was part of the Tollway’s 15-year, $12 billion capital program, Move Illinois: The Illinois Tollway Driving the Future. The Tollway has committed $3.1 billion to the Elgin O' Hare Western Access [...]

Auburn Road Bridge & Roundabout

2017-10-11T19:26:45+00:00

Auburn Road Bridge over Becketts Run and Auburn Road at Wallen Road Roundabout Allen County, IN This project included design services for a bridge replacement and adjacent intersection and path improvements. The replacement structure is a three span reinforced concrete slab with an overall length of 91 feet, and a typical section including two [...]

Multimodal Corridor Enhancement

2017-11-08T21:48:26+00:00

Multimodal Corridor Enhancement (MCORE) Champaign, IL The Champaign-Urbana Mass Transit District, with the support of the City of Champaign, City of Urbana, and the University of Illinois, applied for and received a $15.7 million Transportation Investment Generating Economic Recovery (TIGER) grant for construction of the Multimodal Corridor Enhancement (MCORE) project within the University District. [...]