Belmont North Relief Interceptor - Section 4

38 MGD Lift Station, Standpipe and Odor Control

Location

Indianapolis, Indiana

Service Group

Civil / Environmental

Description

This project includes a new 38 MGD lift station pumping into a 5 mile long 42-inch force main. The outlet end of the force main is a standpipe needed to maintain consistent back pressure on the force main to reduce surge pressures and to prevent draining every pump cycle. Both the lift station and the standpipe are located on City park property and near residential areas. They will both have redundant odor control facilities. Some of the key project elements include:

  • 38 MGD Lift Station
  • 30 ft Tall Receiving Standpipe
  • Energy Minimization/Life cycle Cost Analyses
    • Back-up Power
    • Lift Station Ventilation
    • Geothermal Consideration
    • Pump/Force Main Sizing
  • Dual Feed Power Sources for Backup Power
  • Automation with SCADA Communications
  • On-site Redundant Odor Control Systems
  • Special City Park Aesthetic Features
    • New Playground and Equipment
    • Community Room Incorporated into Lift Station Building
    • Picnic Shelter
    • Soccer Field Spectator Seating Mound
  • Sustainable "Green" Design Features
    • Pervious Concrete and Porous Unit Pavers
    • Rain Gardens
    • Green Roof on Lift Station Building